@GerdW wrote:
Hi depi,
I would link YEL/WHI to either GND or Vcc and switch the other wires/windings as needed…
Being that I am not very confident with my wiring skills, I'd get a technician to do it. Then at least I can blame someone other than me if it blows up. 😉
Bill
(Mid-Level minion.)
My support system ensures that I don't look totally incompetent.
Proud to say that I've progressed beyond knowing just enough to be dangerous. I now know enough to know that I have no clue about anything at all.
Humble author of the
CLAD Nugget.