09-02-2024 12:30 PM
I want to plot a line graph using LabVIEW.In x axis (time) interval for 1 hr(ex:7.30,8.30,etc) in y axis actual values.Both the x and y axis are varry.Actually I have 3 shift.one from 7.30 AM to 4PM another 4.00 PM to 12.30 AM and so on. I have a target values per shift it vary depends upon shift. And actual production values.(ex:targrt-500,actual-350) and time(x axis) 1 hr.How to plot?
09-02-2024 01:34 PM
You can Display Time and Date on a Graph or Chart in LabVIEW