02-24-2020 06:21 PM
Retirement has allowed me to spend time on other projects besides digging out a basement. And until the free version of LabVIEW comes out, I have plenty of time "when I am not developing software.
The Wife has directed me to work on The Hobbit Holes she always wanted.
She wants one of these.
I have been using cardboard to mock-up different ideas since that is a lot easier re-do than concrete 2X4's and drywall. We have settled on the curve steps but that corner with the water heater and furnace is still in flux. I need to maintain access to both of those but need to cover them with something that will fit in a Hobbit Hole. Probably a roll-out book case. That cardboard tree will most likely not make the final cut. While it is an actual template of a tree I have been pruning for years, it would complicate me supporting the house and would be awkward to build book shelves around it.
The cove ceiling has been fun and challenging!
And since we a nice day for a change, I was able to do some work in the woods today that got me thinking about an improvement to the Ram Pump installation.
Possible performance improvement and upgrade to spring water instead of ground water.
Ben
03-04-2020 03:37 PM
I have started to figure out how to edit video and make them shorter.
This one is a sped up progress video of the dig.
Ben
03-05-2020 12:37 PM
Ben,
For tightly curved ceilings, or those that go into directions that drywall does not want to go, use 1/4 plywood. Cut "ribs" and screw them into place. Use drywall "90" to fill the gaps and then start layering the "90" for the rough mudding. Only after you build up 1/2 to 3/4 inch thick do you go to the normal stuff..
It's a lot of work, but it will look great. If the curved ceilings / wall, have a reasonable radius, also use 1/4 in drywall instead of the 1/2. Wetting the back also help, but go very slowly so that you do not break it or drill through it as you mount the pieces in place.
03-10-2020 02:27 PM
@Ray.R wrote:
Ben,
For tightly curved ceilings, or those that go into directions that drywall does not want to go, use 1/4 plywood. Cut "ribs" and screw them into place. Use drywall "90" to fill the gaps and then start layering the "90" for the rough mudding. Only after you build up 1/2 to 3/4 inch thick do you go to the normal stuff..
It's a lot of work, but it will look great. If the curved ceilings / wall, have a reasonable radius, also use 1/4 in drywall instead of the 1/2. Wetting the back also help, but go very slowly so that you do not break it or drill through it as you mount the pieces in place.
Thanks for the info Ray.
I used the "flexible 1/4" drywall for what did two years ago.
The first 1/4"layer went up nice after wetting it but the second layer suffered from me not waiting long enough to soften up. I have considered building a cradle that I can use to soften the drywall before the install. Wet it down and let it sit over-night. But that is just a pipe-dream for now.
I have been splitting my time between that Hobbit Hole project and the Basement excavation as directed by the weather. I managed to get about halfway through the drainage ditches yesterday.
Suggestion:
If you are trying to isolate yourself from possible virus contamination, I suggest digging out a basement by hand. Between the hard work, and mud, isolation is a no-brainer. (smiley-wink)
Ben
03-19-2020 02:25 PM
If I have to be isolated due to the virus, I might as well make some progress with that basement I have been working.
I turned the corner yesterday in that instead of removing shale and mud for the drainage needs I am now putting stuff IN.
Aside from lifting bucket into a cart and then onto the trolley gravity is now working on my side. I have other day of running drainage pipe and gravel back-fill before I start building the forms for the footers.
Ben
03-20-2020 05:27 PM - edited 03-20-2020 05:28 PM
Heavy rain was predicted today so instead of working in the muddy hole, I opted to work in the nice dry Hobbit Hole.
My better-half observed "you spend a lot of time in basements digging don'y you?
Well, yes
Reminds of one of my father's quotes;
"Rayners do not pump iron. We dig dirt."
And one my own based on an old Shoe comic strip.
"Digging out basements is a lot like cigars. They are good for crowd control."
Living a dream,
Ben
03-27-2020 02:14 PM
My better-half has been working from home in out basement office. Spending multiple weeks in a basement is not easy. I suspect those that are in some urban areas could use a "virtual visit to pond with a small waterfall.
Below you will find an ASMR video that will let you spend a half hour sitting next a pond.
In case you need, I i hope it helps maintain some sanity.
Ben
03-27-2020 03:28 PM
Give "slow TV" a try on YouTube @Ben. This example lasts 7 hours:
03-28-2020 06:27 AM
@AustinManinTown wrote:
Give "slow TV" a try on YouTube @Ben. This example lasts 7 hours:
YouTube is actually now blocked at my company due to so many people working from home. VPNs are hitting the network pretty hard, so high bandwidth sites are now blocked.
04-09-2020 11:50 AM
I hope everyone is doing well. I'm also catching up on house projects. I may even have time to send code to Putnam.... from last fall... LOL!