LabVIEW

cancel
Showing results for 
Search instead for 
Did you mean: 

How can I plot over long time, from 1 to 24 hours, and width servral channels in one graph

I have try to get a plot over long time, 1 to 24 hours and more than 2 channels, up to 6 channels in same graph. What I have try is to use a xy plot and then by  letting the x axis min max be controlled, see picture, the thing is you can only use 2 channels to data on a xy plot, if I those a chart plot, when i use the same structure to control the max min for time span, no lines are plotted for some reason, see picture.

 

 

Regards // Thanks

 

Lars

 

 

 

WiFi Guru, proud holder of world record in WiFi, 421 Km @ 2 mbit/s
Download All
0 Kudos
Message 1 of 2
(2,396 Views)

You can put as many XY plots on one XY graph as you like, there should be an example for multi-plot XY (dont have LV infront on me right now).  you can build up in an array the X and Y values and periodically regraph them.  Change the X scal as you wish or just replot a subset of each XY plot.

Paul Falkenstein
Coleman Technologies Inc.
CLA, CPI, AIA-Vision
Labview 4.0- 2013, RT, Vision, FPGA
0 Kudos
Message 2 of 2
(2,368 Views)