01-23-2012 12:16 PM
Hello,
My LabVIEW project (2010SP1) perfoms well except when I add a critical library provided by my customer in the form of a LabVIEW Packed Project Library. Activities like loading the project, opening VIs, running VIs, editing VIs respond VERY SLOW (about 20X). In contrast, if I open VIs in the LVLIBP without loading the project, everything responds at a normal rate.
Any suggestions?
Jorge
02-06-2012 04:30 PM
Hi Jorge,
May I know what does that Packed Library contain? I have read about a similar issue but in that case they were running some TestStand benchmarks that loaded a packed library.