I use VS2008 anf measurement studio 8.6. I execute to dynamic create UI control in the program.
Making the setup package and setuping in the computer in which there are not the vs2008 and measurement studio 8.6,
it prompts that the control is a evalution version limiting in 30 days when the program is creating the UI control.