02-12-2015 09:46 AM
Hi,
I am need of little help in generating report at specific sequence point in sequence file while execution continues.
I am working on a logic (sequence) which consists of 6 stations from station1 to station6 in a loop. This set of stations will be executed by 6 different UUT's and therefore using Batch Porcess Model.
Now at any point any UUT completes station6, report should be genrated for that UUT and the same thread moves back to station1 with new UUT serial number. This sequence will be used in production floor therefore batch report won't suit our requirement rather UUT report should get generated.
I've managed to use PreUUT and PreBatch callbacks for insertion of new UUT serial number at station1 but unable to find solution for reporting.
Is there any way i can use TestReport callback and use in my sequence as subsequence and generate the report?
I am unsure the loads of parameters TestReport sequence seeks for if called as subseqeunce?
Please help.
Thanks in advance,
vivek
02-12-2015 01:55 PM
I am not completely sure I am following your example, but have you tried looking at the Report Options dialog for the batch model. There are options:
Below that is a graphic the describes the workflow.
As I said, I am having a little bit of trouble following your exact secnario, but I think you probably want to check "New UUT Report File for Each UUT." (Note, "Store UUT Report in Batch Report File" must be unchecked to enable this option.)
Hope this helps.
02-12-2015 02:00 PM
Your situation sounds more like a Parallel model. Not the batch model.
Have you considered that model?
02-13-2015 03:20 AM
I have already checked Report options.
But the problem with it is report won't get generate till UUT stops execution.
My sequence won't stop execution, rather it will keep executing in while loop.
The same problem is with the Parallel Model.
02-16-2015 11:40 AM
it is hard to follow..
The report will be generated once the UUT finishes testing and the report will be generated...Then testand will askyou for another set of UUTs too keep testing.
i dont se why you want to keep everything on a loop arent you changing UUTs after you finish testing?
02-16-2015 01:24 PM
Hi Vivek,
Actually i am bit confused with the terminologies that you have used.
Station generally refers to a test machine which is independent ( has its own hardware and software.Each station will run its own test sequence - no way connected to other station).Is that what you meant by station?Do you have 6 test machines with UUT connected to each of them?
The general flow of events for a sequential model are ;
Pre UUT - get serial number
Main sequence ddoing the actual tests
Post UUT - generate reports and again jump back to Pre UUT.
For a parallel or batch model its the same but multiple parallel instances running on the same machine (or station).
Will need more details about what exactly you are trying to acheive.