NI TestStand

cancel
Showing results for 
Search instead for 
Did you mean: 

Managing resources in a Parallel Model

Hi everyone, i have the following problem. I have a teststand sequence using a bunch of custom steptypes for some hardware (DMM/DCPS/AWG) using each one a different visa resource.

I have 2 separate DUTs on which this sequence has to run simultaneously. For this im using the parallel model.

How can i manage the various resources so that the resources will be allocated on one step at a time so that it wont result in a run time error?

0 Kudos
Message 1 of 2
(210 Views)

Have you already browsed through the Synchronization Step Types? A Lock Step pretty much sounds like what you need.

 

Just to make sure.... do you really need the Parallel Model? The BatchModel makes your life far easier.

0 Kudos
Message 2 of 2
(166 Views)