11-29-2017 03:06 AM
Hi,
is it possible to do a Limit test within a period of time?
Normally a Limit test decides if it´s passed or failed with one measurement. I want to capping a longer period of time (if in this period of time is the Limit test passed or failed always)
For any questions I am to you gladly at the disposal.
Kind Regards,
Andi
12-01-2017 02:00 AM
Hello AndreasP92
should this test done in parallel, so that the rest of the application runs?
Can i get some more informations wjat exactly should done?
A simple way was to loop this step or to place it in a while loop with timing.
12-08-2017 07:03 AM
Hi,
no, it is a sequentiell sequence.
I had the same idea with the Loop. But when I use the Loop I have a lot of measurements and a lot of results in the Report, isn´t it?
An Example:
After a undefined time (the time varies) I have a stable process (attachment).
I want to check the value of the y-axis from the time when the value of the y-axis doesn´t change. When the value of the y-axis doesn´t change for 15 minutes, the test is ok. When the value of the y-axis changes the test isn´t ok.
1. I Need the time when the stable process starts
2. I Need one result in the Report that Shows that the value of the y-axis is stable within the 15 minutes.
Do you understand my Problem?
Thanks,
Andreas
12-08-2017 09:16 AM - edited 12-08-2017 09:18 AM
Hello AndreasP92,
a simple schort idea for this
Disable recording for the while loop and look after the loop, if it reaches the loop iteration count or not additional you can insert the result of the last measurement in the report or the time how long it runs without a fail.