Give the user the ability to upgrade versions of Teststand or labview without bringing the test equipment down for several hours. Currently it is quicker to image the whole pc than install a new NI software version. Some of the software (from other vendors) we run has propretiary configuration and imaging isn't always feasible. I would like to be able to upgrade from Labview 8.6 to 2010 without stopping production, just upgraded from 8.2 to 8.6 and on 50computers, on a production floor, it was logistically difficult. It would be a while before I consider upgrading again, with the current setup.