Just seen a demo of LV2011 where the connection pane is automatically wired for created subvis (diagram->selet some stuff->right mouseclick->create subvi).
It would be great if there would be a similar function for new created vi's. When you create a front panel, common sense will let you put the indicators and controls in a way you will wire them to the pane. Controls to the left, indicators to the right. Additional parameters in between. And of course only the 4-2-2-4 pane should be used .
The left/right bottom points are only to be used by the error in/out or left empty since at some time they will become error in/out (if you do not already have a quickdrop template for dropping this structure the first thing after clicking 'new vi')
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.